Is it hard to build a composite deck?

All it takes is a little preparation, and you, too, can install your own composite deck. Start by doing some planning with pencil and paper. Once you’ve designed your deck, make sure you have the tools and materials you need, as well as instructions for installing your deck.

What frame do you use for composite decking?

If you plan to use a long-lasting composite deck, you’ll want a frame that can last as long as well. For composite decking, at least a pressure-treated frame is necessary. However, if you want added durability, you can also find composite decking wood for framing.

How do you start a composite deck?

To install composite decking with a hidden fastening system, start at the house by face-screwing the first board. Next, screw a hidden fastener clip into the groove on top of each joist. Then, slide the groove of the next board into the clips and tighten with a rubber mallet. A clean looking deck border.

How far apart should joists be for composite decking?

The majority of composite deck board brands including Trex, TimberTech, and more require deck joists spacing to be at 16 inches O.C. (on center) for standard straight composite decking installation.

Can I install composite decking myself?

You can build yourself a low-maintenance deck using the same tools and similar techniques as you would a wood deck. And most parts of a deck are now available in composite material.

How long does it take to build a composite deck?

A 12 x 24-foot one typically requires two people to complete and will take anywhere from one to three weeks depending on experience and skill level. A professional team can usually have the project done in a week or less.

How many Trex boards do I need for a 12×12 deck?

(Choose from 8, 12, 16, or 20 ft board lengths. Choose which board best fits the dimensions of the deck.Decking Materials. Board length Boards required 8 FT 206 12 FT 137 16 FT 103 20 FT 83.

Can you use wood joists for composite decking?

Composite decking can be placed on wooden joists when constructing a decking. You must make sure that the joists that you use are pressure-treated joists and that the foundation of the decking is strong enough to hold the decks.

Do you need concrete base for composite decking?

Composite decking is like other building structures, and it needs to be properly installed. You need a solid foundation for your composite decking. A strong decking foundation will make the structure safe to use for outdoor activities. Also, a composite decking that has a strong foundation will last longer.

How do you lay composite decking on uneven ground?

Method 1: Cemented support posts decking base To build a decking base on sloped uneven ground: Clear the area of all grass, weeds and debris using a good quality spade. Dig 1ft deep post holes. Set the posts using post mix so that the top is at or slightly above the desired height.

How do you stagger composite deck boards?

To stagger deck boards start at one corner of the deck with a full board perpendicular to the joists. Measure, cut and lay the next plank end to end with the first so the two butting ends are centered on a joist. Use the cut-off piece next to the full plank to begin the second row. Repeat the alternating pattern.

Do you need special saw blade to cut composite decking?

Cutting composite decking is similar to cutting normal lumber; it just requires special saw blades. So when cutting composite decking, it is advisable to use saw blades that are convenient and flexible for cutting. The saw blades must also be sharp.

Can you screw hollow composite decking?

You can not drill or screw through a hollow composite deck as the screw will become loose and rise in time . Like the usual wooden decking boards, you can also screw down a solid composite decking.

Should deck joists be 2×6 or 2×8?

In general terms, joists spaced 16 inches on center can span 1.5 times in feet their depth in inches. A 2×8 up to 12 feet; 2×10 to 15 feet and 2×12 to 18 feet. The larger the deck, the larger the joists. 2×6 joists should only be used on ground-level decks that do not require, and will not provide for, any guards.

How many support beams do I need for a deck?

For a deck that is 15 feet wide with 2×10 joists spaced at 16 inches apart, you have two options. You can use two beams, one at 7.5 feet and one at 15 feet, to provide support.

Can I use 4×2 for decking frame?

4 x 2 Timber Rail / Joist These decking joists are the most common sized framing timber for decking. They provide a solid structure for fixing your decking boards too. When making your decking frame you should use a 400mm spacing between your timber joists.

How do you finish composite decking edges?

Composite decking ends can be finished by picture framing, raised fascia board, painting the ends, attaching decking veneer, composite nosing strips, vinyl stair nosing cove, composite corner trim or plastic end caps. In short composite decking, ends must be hidden or blended into the look of the decking boards.

What is the easiest composite deck to install?

Grooved decking boards are composite boards with indents or channels on the side. These spaces make it easier for the builders to install the deck.

Is it hard to build a deck yourself?

Building a deck is not as hard as you might think, and if you follow some basic guidelines it can be a great DIY project. Decks are built to add living space to a home and every one of them should be built nice and level.

How much does it cost to build a 16×20 deck?

On average, you can expect to pay about $20,000 for a 16 x 20 foot composite board deck.

How much does it cost to build a composite deck?

The average cost of composite decking ranges from $20 to $38 per square foot with most homeowners spending between $5,821 and $10,826 to install a 12′ x 24′ composite deck with railings. In comparison, a pressure-treated wood deck costs $15 to $25 per square foot while a cedar wood deck starts at $30 per square foot.